<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
<channel>
  <title>Hazid Feed</title>
  <link>http://www.hazid.com/</link>
  <description>News from HAZID</description>
  <lastBuildDate>Tue, 31 Aug 2010 12:00:00 GMT</lastBuildDate>
  <language>en-uk</language>
  <image>
    <url>News/Logo.png</url>
    <title>Hazid</title>
    <link>http://www.hazid.com/</link>
  </image>
  <!-- Start of News Items -->
  <item>
  <title>New Hazid Technologies Ltd. Website goes Live</title>
  <link>http://www.hazid.com/#rssnews</link>
  <guid>http://www.hazid.com/1</guid>
  <pubDate>Tue, 31 Aug 2010 12:00:00 GMT</pubDate>
  <description>&lt;IMG border="0" src="Images/logo_trans_small.jpg"
alt="Hazid"/&gt; After many years of the same old trusty Hazid website we 
have felt it is time for a spruce up. The new website which holds more info 
and viewable presentations and demos is now available fully for users to see. 
You may also now like us, follow us, link us etc. on Twitter, Facebook and 
Linked In. 
  </description>
  </item>
  <!-- put more items here -->
  
  <item>
  <title>SmartPlant Process Safety Webinars</title>
  <link>http://www.intergraph.com/products/ppm/smartplant/process_safety/default.aspx</link>
  <guid>http://www.hazid.com/2</guid>
  <pubDate>Tue, 31 Aug 2010 12:00:00 GMT</pubDate>
  <description>&lt;img border="0" src="News/smartplant_news.png"
alt="Smartplant Logo"/&gt; Our Partner Intergraph is hosting a webinar on “Better Risk Mitigation with Automated Hazop”
  &lt;p&gt; Safety is a key aspect of operating any process, power, 
  or marine facility. Most plants and offshore facilities have large 
  safety record billboards at the plant entrance or in some other prominent 
  location – an important signal that safety is on everyone’s mind every day.  &lt;/p&gt;
  &lt;p&gt; Process facilities are complex, and there are many scenarios that 
  could result in a safety incident. Hazard and operability (HAZOP) studies are 
  used to lower these risks and perform a solid risk mitigation. In this webinar, 
  Intergraph will explain how to dramatically reduce the time in takes to perform 
  HAZOP analyses through automation. Time-savings allows for more frequent studies 
  at a lower cost while increasing consistency and audibility, as well as producing 
  cause-and-consequence reports that allow engineers to make quick and correct risk 
  mitigation decisions. In addition, the webinar will cover how to more effectively 
  conduct safety design reviews, manage risk mitigation action tasks, and create the 
  cause-and-effect matrix.  &lt;/p&gt;
  &lt;p&gt; The webinar is running at 8AM CDT and 7PM CDT. To register please click on the links below:  &lt;/p&gt;
  &lt;p&gt; &lt;a href="https://www2.gotomeeting.com/register/380100994"&gt;7pm cdt &lt;/a&gt;  &lt;/p&gt;
  &lt;p&gt; &lt;a href="https://www2.gotomeeting.com/register/766564890"&gt;8am cdt &lt;/a&gt; &lt;/p&gt;
  </description>
  </item>
  
  <item>
  <title>Next Training dates announced for SPPS</title>
  <link>http://www.hazid.com/Docs/Training.pdf</link>
  <guid>http://www.hazid.com/3</guid>
  <pubDate>Tue, 31 Aug 2010 12:00:00 GMT</pubDate>
  <description>&lt;img border="0" src="Images/logo_trans_small.jpg"
alt="Hazid"/&gt; 
  &lt;p&gt; The Next dates for SPPS training will take place from the 8th November 2010 
  till the 15th November 2010. These will comprise of one weeks formal training at 
  Loughborough University followed by one week of workshop at Hazid Technologies Ltd. 
  Offices in Beeston.  &lt;/p&gt;
  &lt;p&gt; For the formal training, we will work through a project using either one of 
  your P&amp;ID’s or the Hazid training P&amp;I, starting with setting up a project, importing 
  the P&amp;ID information, using the fluids library and running SPPS with out-of-the-box 
  models. The workshop will focus on building new models and modifying existing ones for 
  the same P&amp;ID.  &lt;/p&gt;
  &lt;p style="color: red;"&gt; **UPDATE** - This course is now fully subscribed. &lt;br /&gt; Please contact us to be kept informed of future traning dates.  &lt;/p&gt;
  </description>
  </item>
  
  <item>
  <title>Congratulations Stephen</title>
  <link>http://www.hazid.com/#rssnews</link>
  <guid>http://www.hazid.com/4</guid>
  <pubDate>Tue, 31 Aug 2010 12:00:00 GMT</pubDate>
  <description>&lt;img border="0" src="News/stephen.png"
alt="Hazid"/&gt; 
  &lt;p&gt; Stephen Davey has stormed to victory in the first HAZID TV Squash league. 
  Stephen, who never dropped a point during the entire league, was unavailable for 
  the awards dinner due to other commitments but we had fun none the less.   &lt;/p&gt;  
  </description>
  </item>
  
  <item>
  <title>HAZID 5.1 SP1 release date</title>
  <link>http://www.hazid.com/#rssnews</link>
  <guid>http://www.hazid.com/5</guid>
  <pubDate>Tue, 31 Aug 2010 12:00:00 GMT</pubDate>
  <description>&lt;img border="0" src="News/hazid_arrows.png"
alt="Hazid"/&gt; 
  &lt;p&gt; HAZID 5.1 Service Pack 1 will be released 21st November 2010 this 
  service pack will have the usual bug fixes as well as new functionality 
  including, SI Values can be used as well as your standard units to allow better 
  transfer of data around the world. New SIL and risk admin functions, all hidden 
  fields searchable within the results, Rules can be edited from PHA Editor, Rule 
  history compare, Set up the project tree with any amount of sub levels you wish, 
  Manual PHA functions added to Editor.   &lt;/p&gt;  
  </description>
  </item>
  
</channel>
</rss>

